在线 | 一区二区三区四区-在线 v亚洲 v欧美v 专区-在线 成人-在线 丝袜 欧美 日韩 制服-女性影院-欧乱色国产精品兔费视频

Contact Us   
Search   

How to Install a Floating Ball Valve ?

2013/11/10      view:

A floating ball valve in your pipeline often needs to be changed and substituted by a new one for repair or renovation purposes. Instead of spending money in hiring professional plumbers, a simple guide shall teach you how to install them all by yourself, saving money as well as precious time.

Step 1: Initial Steps

Before you start, disconnect the water supply to the toilet and flush out the water entirely. This will empty your cistern which is necessary for replacing and installing a floating ball valve.

Step 2: Locate the Point of Installation

You need locate the exactly place where the floating ball valve is set up. Carefully open up the lid of the cistern and keep it aside so that there are no chances of it cracking up. Locate the lever of the flush and pull it out with care that it does not break. If you have a button flush, simply loosen the screws and take it out.

Step 3: Uninstalling the Valve

Take a good look at the internal set up of the cistern and valve components. The float arm is connected to the ball-shaped valve, which has the pin like structure attached. Apply light pressure to make this pin straight. This way the valve sits loose. Next, the cap-like end of the cylinder inside, called the piston, too can be removed after the valve comes off. Sometimes due to long use, the piston gets jammed and does not come off easily. In such a case, apply some lubricant after unscrewing the end part of the piston and leave the oil to work its effect. In about an hour, try removing the piston, it should come off without much difficulty.

Step 4: Install New Valve

Purchase a new floating valve kit from a hardware shop. Read the instructions on its backside before starting the installation process. Clean up the piston stem using a piece of wire wool to rid it off any clogged fragments. Connect the pin to the piston after screwing in the washer. Now the end of the pin that is free must be inserted into the valve. Next the valve must be connected to the floating arm in the place that has a dent made already. You can apply some petroleum to the thread of the piston so that it remains smooth for some time.

Step 5: Final Step

Re-establish the water connection and fill the cistern with water. Check for any leaks or seepage of the water. If no problems are seen, then the installation is a success. Put the cistern flush by screwing it up and place the cistern lid back into place. Check for any water seeping through the flush as well. Your floating ball valve is all set up. Make sure that you do not apply too much pressure on any part during the installation procedure. It might lead to major cracks that could burn a hole into your pocket if it needs to be replaced.

主站蜘蛛池模板: 大又大又粗又爽女人毛片 | 午夜视频在线免费播放 | 亚洲一本之道在线观看不卡 | 萝l在线精品社区资源 | 亚洲成网站www久久九 | 日日噜夜夜噜 | 国产欧美一区二区三区观看 | 成人在线a | 一级日本高清视频免费观看 | 逼逼视频网站 | 快色视频在线观看 | 19xxxxxxxxx日本69| 女人大毛片一级毛片一 | 亚洲综合色色图 | 欧美深夜 | 欧美日韩视频综合一区无弹窗 | 黄色大秀视频 | 日本s色大片在线观看 | 免费日韩网站 | 台湾av | 久久手机视频 | 丁香花免费观看视频 | 久久国产免费观看 | 免费日韩三级 | 很狠操 | 色视频网站在线 | 久久久久免费观看 | 亚洲日本一区二区三区 | 亚洲激情 | 扒开双腿疯狂进出爽爽爽 | 五月天婷婷伊人 | 亚洲第七页 | 激情文学亚洲色图 | 欧美在线不卡视频 | 亚洲情a成黄在线观看 | 欧美色图综合 | 欧美性色xo影院在线观看 | 国产精品三级国语在线看 | 在线观看亚洲一区 | 国产成人毛片毛片久久网 | 国产精品情人露脸在线观看 |